GENERAL PERFORMANCE OF AMECO EQUIPMENT
(Supplied - present capabilities*)

Reclaimers:
Max. Capacity built: 1200 MTPH or 2500 m3/H — 3000 TPH*
Max. Span built: 63.5 m - 65 m*
Anticipated delivery time: 10 to 12 months.

Clinker silos:
Max. capacity built: 18000 T dia. 98 m — 120 m*
Reclaiming capacity: 500 MTPH — 1500 MTPH*
Anticipated delivery time: 11 to 13 months

Longitudinal Homogenizing System:
Max. Width 50 m - 55 m*
Reclaiming 500 MTPH - 1000 MTPH*
Stacking 2500 MTPH - 5000 MTPH*
Anticipated delivery time: 11 to 13 months

Circular Homogenizing System:
Max. dia. 100 m - 120 m*
Reclaiming 500 MTPH - 1000 MTPH*
Stacking 2500 MTPH - 5000 MTPH*
Anticipated delivery time: 11 to 13 months

 

 

Prilling towers:
Max. tower dia.: 28 m - 35 m*
Max. reclaiming rate: 200 MTPH - 400 MTPH*
Anticipated delivery time: 5 to 6 months

Bucket wheels:
Max. capacity built: 2000 MTPH — 3000 MTPH*
Max. built boom length: 50 m — 55 m*
Anticipated delivery time: 12 to 14 months.

Stackers:
Max. capacity built: 2500 MTPH - 5000 MTPI~I*
Max. boom length built: 80 m
Anticipated delivery time: 10 to 11 months.

Shiploader bulk/bags:
Max. capacity 2200 TPH / 2500 bags/hour - 5000 TPH*
Max. ship size: 61,000 DWT - 120,000 DWT*
Anticipated delivery time: 12 to 14 months.

Belt conveyor systems:
All types and sizes up to 2500 MTPH — 5000 MTPH*
Anticipated delivery times: 5 to 8 months.